Electric:
GA Power and Colquitt EMC
3 phase 12kv distribution
Construction times for 3 phase 12kv
3 months
To build new transmission lines
8 - 12 months
Water Supplier:
City of Valdosta
There is a 10" water main within the park that is connected to an 8" main.
80psi w. 1219gpm
Wastewater Service:
City of Valdosta
8" gravity on site