Bassford Business Park
Electric:
GA Power and Colquitt EMC
3 phase 12kv distribution
Construction times for 3 phase 12kv
3 months
To build new transmission lines
8 - 12 months
power lines
Water Supplier:
City of Valdosta
16" water main on southside of property
12" main on site. 64 psi w.
Flow rate of 1193 gmp
water lines
Natural Gas:
Atlanta Gas Light
6" high pressure steel main w. 125 psi
gas lines
Wastewater Service:
City of Valdosta
8" gravity on site
wastewater lines
Fiber:
AT&T
100 mbs+
Telecommunication lines